Back to All Events

Daikin 8 Zone Key Point Installation

  • Standard Supply 3206 Longhorn Boulevard Austin, TX, 78758 United States (map)

Techniques for proper installation of the Daikin 8 Zone Multi Split. Course includes, piping, electrical, equipment installation, evacuation, and charging. A three-hour confidence building review session before administering the EPA Section 608 Exam. It is strongly recommended that participants download the Section 608 Preparatory Manual to read and study the material carefully before challenging the EPA Exam. Exams are offered in English or Spanish. Register here.

Later Event: January 30
EPA Exam Review & Testing